Introduction:
The SG type electric boiler boils the water in the collection tank through an electric heating tube, and convection generates steam and passes through the connection into the steam chamber. This product adopts an automatic water injection system, which eliminates the trouble of traditional artificial repeated water addition. The computer will automatically detect the water level. When the amount of water is insufficient, water can be automatically added to ensure the continuous use of steam to avoid the impact on production when artificial water is added. This product is executed in accordance with the import production standards. The selected electrical accessories are selected import quality requirements, so please feel free to use. The shell of this product adopts pure stainless steel texture, and does not mention the concern about the corrosion of steam and water on the shell during the use process to ensure the appearance of lasting beauty.
Features:
1, electric steam boiler design normal water level ≤ 30L, not within the scope of national monitoring, boilers do not need annual review, save heart and mind;
2, efficient, unique internal bile and soda separation structure design, ensure the rapid provision of high-quality steam;
3, the use of high-quality tank manufacturing, after 1.5 MPa pressure test testing no leakage, no deformation;
4, convenient operation, automatic control, automatic pressure control, water level control, water shortage protection, automatic alarm. No need to be on duty;
5, adopt external water level monitoring, convenient maintenance;
6, adopting high-temperature wire, high insulation level, durable;
Electric heating tube and furnace body with flange connection, easy maintenance;
8, installation maintenance is simple, compact structure, small area, whole machine integrated factory, easy to install.
Principle:
1. This machine needs to designate a professional operator and be familiar with the operation manual before operation. Before operation, please carefully memorize the relevant safety signs and functional marks around the device.
2. When using three-phase electricity, you need to distinguish between the fuse and the zero line. The zero line number will be marked with N. When the connection is completed, an electrician is required to install it on the spot or be instructed by the electrician to install it. After the connection is completed, pay attention to the direction of the pump rotation. If there is a reverse, please switch the fuse installation order.
3. The machine shell is equipped with a ground line installation location. Please connect the ground line when using it.
4. Before booting, please check whether the power cord is connected, whether the connection is locked, whether the wire is connected correctly, and whether there is a phase defect or leakage phase. After the power inspection is completed, please check whether the water tank is filled with water, whether the connection with the water pipe is intact, and the light push ball valve checks whether the inlet is normal.
5. After use, please release the remaining gas from the furnace in time to avoid the loss of steam purity caused by false air pressure during next use. After daily use, please discharge the remaining waste water from the furnace. Frequent water exchange can reduce the impurity content in the furnace and increase the service life of the equipment.
6. Keep the furnace tank under slight pressure when discharging water after use, which can promote better removal of impurities in the pipeline. The pressure is below 0.1 MPA.
功率kw | 额定蒸发量kg/h | 额定蒸汽压力Mpa | 适用电压v | 运输尺寸cm |
4 | 6 | 0.4-0.7 | 220/380 | 48*32*60 |
6 | 8 | 0.4-0.7 | 220/380 | 50*35*68 |
9 | 12 | 0.4-0.7 | 220/380 | 55*35*80 |
12 | 16 | 0.4-0.7 | 380 | 55*38*80 |
18 | 24 | 0.4-0.7 | 380 | 58*45*110 |
24 | 32 | 0.4-0.7 | 380 | 58*45*110 |
36 | 50 | 0.4-0.7 | 380 | 70*50*130 |
48 | 65 | 0.4-0.7 | 380 | 70*50*130 |
60 | 85 | 0.4-0.7 | 380 | 80*60*145 |
72 | 108 | 0.4-0.7 | 380 | 85*70*145 |