Five engineers finished installation came back from Vietnam
Category: Company News
Date: 2015-12-08
Click: 1697
Author: 佚名
Collection:
Five engineers finished installation came back from Vietnam
After one-month installing and testing, the whole complete sets of alkyd production plants (including pipelines, valves, reactor, blending tank, control system, hot oil boiler, pump etc. ) are finished final acceptance successfully,  Our company’s engineers came back in Nov. 25th, 2015.
Thanks to customer and engineers, we finished the project successfully.

1528505539205025309.jpg

Previous: JINZONG COMPANY 2016 EXHIBITION INFORMATION
Next: China Coat 2015 (Shanghai)Exop from 18th to 20th Nov. 2015,welcome to visit our Booth C73-76,in hall

PRODUCT CENTER

SOLUTION

Vacuum Emulsify Machine

Custom Reactor

Dispersion Machine

Sanding Machine

Mixing Machine

Filling Machine

Cream emulsion machine

Stainless steel storage tank

Water treatment machine

Primary fermentation equipment

Automatic production system


Cosmetics production equipment

Cream production equipment

Liquid production equipment

perfume production equipment

Lipstick production equipment

Fog tank production line equipment

Powder production line equipment

Toothpaste production line equipment

Soap production line equipment

Chemical production equipment

Alkyd resin production line equipment

Acrylic resin production line equipment

PU polyurethane production line equipment

Epoxy resin production line equipment

Polyol production line equipment

Silicone oil production line equipment

Hot melt adhesive production line equipment

Modified rosin resin production line equipment

Adhesive production line equipment

Water reducing agent production line equipment

LED raw material mixing production line equipment

Water based acrylic acid production line equipment

Water based PU resin production line equipment

Paint production equipment

Oil paint production line equipment

Ink production line equipment

New Energy materials production equipment

Lubricating oil production line equipment

Vehicle fuel tank production line equipment

Food additive production equipment

Pharmaceutical equipment

Ointment production line equipment

Syrup production line equipment

Injection and potion production line equipment

Internet application

Contact Us


Tel86-20-39900130
Headquarters Add: Tian An HI-tech Ecological Park, Panyu Dist., Guangzhou City, China
Factory Add:NO.3, Kangtai Street, Zhaoqing National High-tech Zone(Dawang),Guangdong Province
Tel: 86-758-3623881

  • Official WeChat
  • official Weibo